Solution

FOD’s Founders have extensive experience from designing, constructing,
commissioning, installing, operating and financing offshore units

Single source contract – simplifies and enables efficient execution

FOD’s partners (Wärtsilä, Global Maritime and Pact Engineering) are experts covering the entire
scope of technical disciplines (naval architecture, mooring/subsea and process plant)

POWER OPTIONS & CAPACITY (client dependent)

LNG (shown) – MDO (diesel) – BIO (gas/diesel) – SHORE POWER (wind/sun/bio)

Our generic unit is a 75,000 m3/day unit, fueled by LNG

Moored 500m offshore at water depth; 30-100 m and with subsea piping for both water discharge- and brine lines

Single-pass RO (150-350 TDS)

Options :
Single-pass: 100,000 m3/day

Double-pass: 75,000 m3/day

Generic

DESALINATIONDESALINATIONMOORING/SUBSEAMOORING/SUBSEAFUELLNG BasedFUELLNG Based
Seawater temp.5 – 35 deg. CDistance from shore50 – 500 mBudget PriceUSD 5,5 /MMBtu
Salinity15.000-47.000 mg/lWater depth8 -100mLNG USD/m30,20
Intake depth5 – 15 mShelteredyesLNG bunkering/m30,05
Single pass150 – 350 TDSMooring lines8POWERPOWER
Lift level at deliveryMax 25 mBottom conditionsSandy and flatTotal (unit & plant)4,2-4,6 kwh/m3

INVESTMENT/PRODUCTION RATIO

Waterfront property value included? –

Dedicated power plant included? –

COUNTRYPLANT NAMECAPACITY M3/DAYUSDM INVESTMENT
FloatingFOD (2021)75 000 (100 000)120 (130)
GhanaAccra (2015)60 000125
KenyaLikoni (2021)100 000154
ChinaQingdao (2013)100 000176
AustraliaTugin (2009)133 000943
Jebel AliDewa (2020)182 000237
USACarlsbad (2014)189 000904
MoroccoDouira (2021)227 000301
OmanSumitomo Plant (2014)197 000377
EmiratesTaweela (2022)909 200900

SEAWATER DESALINATION COSTS

Waterfront property value included? –

– Dedicated power plant included?

China: Desalination cost in the range of USD 0,73 – 1,18 / m3

(Ref: by GBTIMES Beijing Jul 20, 2017)

RegionUSAHong KongAustralia
Project nameCarlsbadTseung Kwan OGold Coast
Plant locationCaliforniaTseung Kwan OTugin
Plant Construction date201420192009
Plant capacity m³/d189,000135,000133,000
Unit Production cost, USD / m³1,861,301,62

KEY FIGURES – WATER PURCHASE AGREEMENT

Power plant and fuel included

WATER PURCHASE AGREEMENT (WPA)

TOTAL COST IN USD PER CBM

KEY FIGURES – WATER PURCHASE AGREEMENT

Excl. power plant and fuel

Water Purchase Agreement (WPA)

Total cost in USD per cbm with shore power

Timeline –construction, mobilization and production

COMMERCIAL SOLUTIONS

All financial estimates are based on 2021 pricing

LONG TERM WPA CONTRACT:

FOD will:

  • Financing the construction, mobilize/moor and operate the unit
    • Fixed crew 24-7, with remote process monitoring
    • Long term service agreements with all suppliers
    • Daily operation and maintenance
  • Manage fuel agreement on behalf of client
  • FOD will offer:
    • firm price on:
      • Production of drinking water (metering station onboard and optional ashore)
      • Fuel logistic
      • mobilization/mooring and subsea installation
  • Budget price on:
    • fuel / power cost

UNIT ACQUISITION:

  • Financing the construction, mobilization/anchoring and time-agreed operation of the unit
    • Fixed crew 24-7, with remote process monitoring + training of client personnel
  • Client will purchase the unit upon successful acceptance test
  • Manage fuel agreement on behalf of client
    • Both logistic supply and purchase agreements for same period as agreed for supervision
  • FOD will manage supplier service agreements
  • FOD will hand over at client preference

Alternatively offer same to industrial investor, responsible for financing the construction

– OR COMBINATION OF ABOVE –

OUR ADVANTAGES

Floating Offshore

Minimal (expensive) water front property needed

Easy Connectivity

Relocating to other coastal areas is possible if demand is changing

High

Efficiency

Avoiding water intake and outfall pipelines usually required for on shore-plants

Safe Brine Discharge

500-2000m off-shore enviromentally friendly spread brine discharge at 2-bar-pressure

Low Capex

Invest from 120$M/75000cbm / day instead of 943$M / 133000cbm / day

90% Generic Designs done

Only final client adjustments needed -ensuring max 3 months to contract signing

Fast 3-year ready-to-run

FOD offers flexible one-stop-shop solution with service to rent/buy/invest

80% Yard Financing

Option for client to get financing based on Sinosure support

Cost Effective Build

Ship-yard with all existing facilities and expert staff can build in parralel 

Many more advantages…

Easy operation / maintenance and high fuel efficiency with low CO2 emission